It is abutted with a gutter which is a flat concrete slab that drains out water away from the yard.
Conc gutter ty a valley gutter.
Conc curb ty d barrier.
Conc curb mono ty ii a lf.
Conc curb mono ty i mod lf.
Asphalt pavement 3 1 steel dowels 18 long through expansion joint typical 4 wide 6 thick concrete valley gutter 1 valley 2.
Of valley gutter spouting 250 mm minimum overall valley gutter width 20 mm cut out to fascia valley rafter continuous solid support for valley gutter metal valley gutter half of gutter shown dotted 80 mm minimum roof overhangs valley rafter rafter continuous solid support for valley gutter 50 mm minimum e2 as1 but 100 mm recommended purlin.
Conc gutter ty b valley gutter notes.
2 do not place backfill or pavement adjacent to the curb curb and gutter gutter shoulder 3 berm gutter expressway gutter or concrete valley gutter until at least 3 curing days as 4 defined in article 825 9 have elapsed.
Conc valley gutter ty a 6 ft notes.
Curb and gutter endings adjacent to flexible pavement curb and gutter and type a curb contraction joint in curb concrete bumper guard asphaltic concrete curb contraction joint in curb and gutter and concrete pavement expansion joint between gutter sawcuts should be avoided within valley gutter and within curb and gutter endings.
Depth of sawcut depth of sawcut depth of sawcut type e type f shoulder gutter type a type b type d contraction joint in curb contraction joint in curb and gutter depth of sawcut depth of sawcut depth of sawcut sawcuts should be avoided within valley gutter and within curb and gutter endings.
Curb is a short wall installed to hold the pavement from the sides and act as a barrier between yard and street.
Quantity avg bid quantity avg bid.
Perm ctb sgl slope ty 2 42 lf.
Conc curb ty b mountable.
Conc curb gutter ty ii mod lf.
Conc curb gutter ty ii a lf.
Item no description units march 31 2019 twelve month moving usage.
Form saw or score 1 as the curb and gutter just ahead of the taper.
In height to 0.
Item no description units march 31 2019 twelve month moving usage.
Usually curb and gutter are constructed together at a site.
P projects 3667 2013 standard specifications detail plates str 6 dwg concrete valley gutter flowline flowline flowline 6 typical type 1 curb gutter typical 25 radius typical 6 conc.
Install an 18 tie bar across the joint.
In this article.
Install a 1 2 premolded full depth isolation joint the same shape abut existing curb and gutter taper the last two 2 feet of the curb from 6 8.
5 complete backfill within 4 calendar days after the completion of the 3 day curing period 6 unless otherwise approved.